Going Batty

I have to admit, it is quite a predictable, corny title for this post, but it was quite impressive to arrive out at the house early this afternoon to find the whole place was basically covered in pink batts. Well, pink and green batts. (The green are for noise reduction rather than insulation.)

And they’d apparently done it all in a day! Though to be fair there were quite a few of them around, apparently getting under all the builder’s feet.

I’m not quite sure how to feel about all the batts though. They hide most of our handiwork of the weekend! There are still a few cables that you can see, but the majority are now under/over/behind the bats. I hope we never have to dig them out!

And the Hebel cladding is now about 85% finished, but there’s no sign of the Linear going on yet. And until that stage they can’t get on and do the gibbing, although the gib board is all piled up in the lounge just waiting to go on the walls and ceiling.

I guess we’ll see if they can get it together enough to work over the break, or whether things will grind to a halt for the next couple of weeks.