{"id":1564,"date":"2011-04-04T22:44:57","date_gmt":"2011-04-04T10:44:57","guid":{"rendered":"http:\/\/coffeehouse.co.nz\/wordpress\/?p=1564"},"modified":"2011-04-04T22:44:57","modified_gmt":"2011-04-04T10:44:57","slug":"one-step-forward","status":"publish","type":"post","link":"https:\/\/coffeehouse.co.nz\/wordpress\/?p=1564","title":{"rendered":"One step forward&#8230;"},"content":{"rendered":"<p>Or is it two steps?!<\/p>\n<p>The en suite bath had been installed when we arrived today, which was good&#8230;<\/p>\n<p align=center><a href=\"https:\/\/coffeehouse.co.nz\/wordpress\/wp-content\/uploads\/2011\/04\/Bath2.jpg\"><img src=\"https:\/\/coffeehouse.co.nz\/wordpress\/wp-content\/uploads\/2011\/04\/Bath2.jpg\" alt=\"\" title=\"Bath installed\"  \/><\/a><\/p>\n<p>But the, errr, revised granite bench needed a bit of assistance into position. That stuff is heavy! And watching them take a hammer to the old piece to help get it out was a bit sad really!<\/p>\n<p align=center><a href=\"https:\/\/coffeehouse.co.nz\/wordpress\/wp-content\/uploads\/2011\/04\/graniteinstall.jpg\"><img src=\"https:\/\/coffeehouse.co.nz\/wordpress\/wp-content\/uploads\/2011\/04\/graniteinstall.jpg\" alt=\"\" title=\"granite install\"  \/><\/a><\/p>\n<p>Additional additions today were installed toilets <em>(although all is not yet right with them)<\/em>, installed wardrobes<em> (although all is not right with them either)<\/em>, kitchen sinks (right <strong>this<\/strong> time), the gas for the cooker <em>(first time we can award a tick first time)<\/em>, and a cleaner doing a first clean of the place <em>(just before all the remedial work gets done and the place turns into a mess again!)<\/em><\/p>\n<p>Some of the other additions aren&#8217;t quite so good though. We&#8217;ve added a very large number of little orange dots around the place where we&#8217;ve spotted issues with the painting. I did mention that there was a large number of these, didn&#8217;t I?! In fact we&#8217;ve added so many we might have to wait a little longer to move in until they&#8217;ve all been fixed. But I think that&#8217;s worth the wait.<\/p>\n<p>So we&#8217;re sooooo close, but yet so far away. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Or is it two steps?! The en suite bath had been installed when we arrived today, which was good&#8230; But the, errr, revised granite bench needed a bit of assistance into position. That stuff is heavy! And watching them take a hammer to the old piece to help get it out was a bit sad [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[12],"tags":[],"_links":{"self":[{"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/1564"}],"collection":[{"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1564"}],"version-history":[{"count":3,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/1564\/revisions"}],"predecessor-version":[{"id":1569,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/1564\/revisions\/1569"}],"wp:attachment":[{"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1564"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1564"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/coffeehouse.co.nz\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}